Automatically generate a prediction of a TBM size, launch shaft and surrounding worksite size needed for your tunnel project.
Input tunnel geometry
This tool is intended for an estimate and cannot replace any design.
Tunnel internal dia.m
Enter a number between 0 & 16.
Geology
Worksite shape
TBM specification
CalcForge has found data from - similar projects to generate a prediction.
TBM Type
TBM Diameter
-m
TBM Cutterhead Length
-m
TBM Cutterhead Weight
- tonnes
Worksite layout prediction
Example - TBM launch site
Worksites can come in a wide variety of shapes and sizes, the example seen below gives a sample which can be adapted to suit your site conditions and includes all the major items of supporting plant.
Property
Value
Minimum recommended site area
16000m2
Approx height
-m
Approx width
-m
Minimum site layout areas
Label
Item
Area (m2)
1
Launch shaft
See section below
2
Segment storage area (2 weeks supply)
2,500
3
Site offices + welfare
800
4
Temporary muck storage area
-
5
Workshop
500
6
Materials storage
500
7
Electrical sub-station
300
8
Testing area
100
9
Tunnel vent cooling tower
50
10
Gantry crane
300
11
Grouting plant
150
12
Tunnel ventilation fans
100
13
Compressed air pumps
100
14
Emergency assesmbly area
100
15
ECM Plant
150
16
Waste water pit
250
17
Slurry treatment plant
2,000
Launch shaft prediction
Rectangular TBM launch shaft long mode
In an ideal case, where space surrounding the launch shaft is not a limiting factor the TBM can be launched in "long mode", whereby the TBM is launched along with it's backup gantry. This is benefitial as it means that the full assembly of supporting equipment is available to the TBM during the launch, improving speed, safety and reliability.
Label
Property
Area (m)
a
Shaft Length
-m
b
Shaft Width
-m
c
TBM Diameter
-m
d
TBM Length
-m
e
Backup Length
-m
Rectangular TBM launch shaft short mode
In many cases there is not enough space to launch the TBM with its backup gantry, in this case the contractor will typically launch the TBM in short mode (and may often mine an SCL launch chamber for the TBM depending on ground conditions), once the TBM has advanced far enough, the TBM advance is halted and the backup gantry is connected.
Label
Property
Area (m)
a
Shaft Length
-m
b
Shaft Width
-m
c
TBM Diameter
-m
d
TBM Length
-m
e
Thrust frame
-m
Circular TBM launch shaft
The minimum size of a circular shaft for launching a TBM in short mode is given as follows.
Label
Property
Area (m)
a
Internal diameter
-m
b
TBM Length
-m
c
TBM Diameter
-m
d
Thrust frame
-m
What's this calculator used for?
This tool can be used by Tunnel Engineers and Geotechnical Engineers to estimate the worksite layout needed for an underground TBM tunnelling project.